Project #ST-2041 · Active
Message your specialist
Good afternoon, Harrison family.
Here's where your project stands today.
Residential · Kitchen & Fireplace · Highland Park, TX
The Harrison Residence
Current Status
In fabrication: your Calacatta slabs are on the waterjet this week.
Design & Selection
Engineering
Fabrication
Installation
Complete
3
Slabs selected
148
Sq ft fabricating
Sep 18
Install scheduled
Oct 2
Est. completion
Project Timeline
- Jun 4, 2026Design & slab selectionHand-selected 3 Calacatta Gold slabs at our Garland yard.
- Jul 9, 2026Shop drawings approvedFinal drawings signed off; field measurements verified on site.
- Aug 4 – Aug 15, 2026Fabrication in progressWaterjet cutting and edge profiling; book-matching the island waterfall.
- Sep 18, 2026InstallationOur crew sets countertops, backsplash, and the fireplace surround.
- Oct 2, 2026Final walkthroughSeal, polish, and sign-off with your project specialist.
Recent Photos
Slab selection & reference imagery. Fabrication photos will post here as your pieces are cut.
Documents
- PDF Signed proposal & contract
- DWG Approved shop drawings
- PDF Slab certificates of origin
- PDF Care & sealing guide
Updates from your team
- Maria, Project SpecialistAug 5
Your island waterfall is being book-matched today: the veining lines up beautifully. Photos to follow.
- Shop, FabricationAug 4
Slabs moved to the waterjet. On schedule for a Sep 18 install.
Your specialist
Maria Delgado
Direct line & email on your proposal. Reach out any time: one point of accountability, quarry to install.
Send a message© Stone-Tec Inc. All rights reserved.
